S&F Marine Construction

Waterfront guide

Dock Repair or Replacement? A Homeowner’s Inspection Checklist

Most dock problems give some warning before they become expensive. This checklist covers what to look at, what storm damage looks like, and how to think through repairing versus replacing.

· 6 min read · General guidance, not a site assessment

How often to look

Professional waterfront maintenance guidance calls for inspecting everything above the waterline, including the splash and tidal zones, every year, and inspecting timber members at least every three years, more often where marine borers are a known problem 2. For a homeowner, a simple rule works well: walk the dock once a year at low tide, and again after any named storm or strong nor’easter.

The checklist

Pilings

  • Look for wear at the waterline. Gribble erode wood between tide levels, leaving heavily attacked pilings with an hourglass shape 1. Floating debris and moving water also wear pilings most in the intertidal zone 2.
  • Look for small holes near or below the waterline. Shipworm entrance holes stay small while the inside of the wood is honeycombed 1.
  • Check pile tops for softness or splits. Cut tops expose untreated wood and should be treated and capped 1.

Framing

  • Probe stringers, joists, and beams with a screwdriver, especially where they sit on pilings or where water collects.
  • Look for sagging spans, cracked members, and joists pulling away from their hangers.

Fasteners and hardware

  • Look for rust stains, swollen bolts, and connectors with flaking coatings. FEMA notes corrosion rates for metal are dramatically higher in coastal environments and recommends inspecting connectors and fasteners at least annually 3.
  • Remember that wood preservative chemicals can also contribute to fastener corrosion 3.

Decking and floats

  • Note soft, cupped, or split boards and raised fasteners that catch bare feet.
  • On a floating dock, check whether it sits level, whether any section rides low, and whether the floats are cracked or the foam is exposed.

What storm damage looks like

After a storm, the obvious damage is missing boards and broken rails. The quieter damage matters more: pilings that have shifted or lean, connections that have loosened, floating sections that slid on their guide pilings, and gangways twisted at the hinge. Look at the dock from the water side and from shore, not just from the deck. If something looks out of line, stay off that section until it has been checked.

Take photos before anything is moved or cleaned up. They help with insurance claims and with any later decision about whether the work counts as repair or replacement.

Do not forget the hidden hardware. Salt spray is heaviest near breaking waves and drops off quickly within the first 300 to 3,000 feet of the shoreline, but FEMA cites studies showing faster corrosion as far as 5 to 10 miles inland 3. A storm that soaks a dock in salt water can speed up rust on bolts and connectors that were already marginal.

Common repairs and what they involve

  • Decking replacement. Swapping worn wood boards for composite is one of the most common upgrades. It only makes sense if the framing underneath is sound, so expect the joists to be checked once the old boards come up.
  • Framing repair. Rotten or cracked stringers and joists can be replaced or reinforced section by section. Keep track of how much is being rebuilt, since the permit line between repair and replacement is based on the share of structural parts involved 4.
  • Hardware upgrades. FEMA notes that Type 304 or 316 stainless steel, or hot-dip galvanized hardware with a heavy zinc coating (G185 or thicker), reduces corrosion compared with lighter coatings, and it discourages mechanically galvanized fasteners for exterior coastal use 3.
  • Piling protection. When working around pilings, avoid cutting or notching them below the waterline, which opens a path for borers 1.
  • Floating dock repair. Typical fixes include replacing damaged floats, worn hinges or connectors between sections, and the hoops or brackets that ride the guide pilings.

Repair or replace?

There is no single answer, but a few questions sort most docks out:

  • Are the pilings sound? Pilings are the hardest part to fix later. If they are solid, repairing the framing and decking above them usually makes sense. Plastic wraps are widely used to stop or prevent borer attack on pilings and cost less than encasement or replacement 2.
  • How much of the structure is affected? Under North Carolina rules, repair does not need a CAMA permit, but replacement does. For a fixed dock, work counts as replacement if more than half of the framing and structural parts must be rebuilt; for a floating dock, more than half of the square footage 4.
  • Does the dock still fit how you use it? If you have wanted a bigger platform, a lift, or a better gangway, that is a design change, and enlarging a structure in any dimension counts as replacement under the same rule 4.
  • Is the wood near the end of its life? If borers and rot show up in many places, repairs may only buy a short time.

S&F Marine Construction repairs docks across Brunswick County, including replacing worn decking with composite and converting wood docks to welded aluminum framing. Whether your dock needs a few boards or a new start, a free estimate is the simplest way to find out where it stands.

Common questions

How do I know if my dock pilings are bad?

Look for an hourglass shape at the waterline, small holes near or below the water, and soft or split tops. Shipworm damage can be hidden inside a piling that looks fine from the outside, so a closer inspection is worth it if the dock moves more than it used to.

Do I need a permit to repair my dock?

Repair does not need a CAMA permit in North Carolina. Work becomes replacement, which does, if more than half of a fixed dock’s structure or a floating dock’s area must be rebuilt, or if the dock is enlarged. DCM makes the final call.

Can a wood dock be rebuilt in aluminum?

Often, yes. S&F does wood-to-aluminum conversions. Whether existing pilings can be reused depends on their condition.

What should I do right after a storm?

Stay off any section that looks out of line, photograph the damage before moving anything, and check pilings, connections, and floating sections from the water side as well as the deck.

Sources

  1. Wood Handbook, Chapter 14: Biodeterioration of Wood (FPL-GTR-282, 2021), USDA Forest Service, Forest Products Laboratory.
  2. UFM 4-150-07, Waterfront Facilities: Operation and Maintenance (March 2026), U.S. Department of Defense, Unified Facilities Manual (Whole Building Design Guide).
  3. NFIP Technical Bulletin 8: Corrosion Protection for Metal Connectors and Fasteners in Coastal Areas (2019), Federal Emergency Management Agency (FEMA).
  4. 15A NCAC 07J .0210 — Replacement of Existing Structures, NC Administrative Code (Office of Administrative Hearings).

Ready to build a better waterfront?

Tell us about your dock, pier, lift or seawall. Estimates are free, and we usually respond within one business day.

Call Free Estimate